The installa�on process takes mul�ple steps, please perform strictly as per the steps here listed. Read the
Installa�on chapter completely and thoroughly before beginning so as to have a be�er understanding of the whole
process.
Only factory-supplied parts that came with your
hoist
shall be used, otherwise you void the warranty and could
cause injuries to the installers or operators. If parts are missing, please contact our local partners or
Advance
AutoQuip 2000
sales that you originally purchased from. You can also call +
61 (08) 9279 1663
or send email to
sales@aaq.net.au
men�oning the problem that you are experiencing.
4.1
Necessary tools
Note:
for unloading & goods transporta�on purposes, 5tons forkli� or crane is required
.
4.2
Unloading and unpacking
When receiving the cargos, please check the packaging carefully and thoroughly. Contact sales person of
Advance
AutoQuip 2000
to verify the causes for any shortages or damages. Claims for material damage shall be made
against the
transporta�on company.
Once the goods are signed and unloaded, they are your responsibility to handle. Carefully remove the cra�ng, steel
frames or any other packing materials.
Be careful when removing any packing materials as components may loose and fall, causing injuries.
Check the voltage and phase requirements showed on motor or carton of power pack.
Structural parts could be very heavy, forkli�s or cranes shall be used to move them into posi�on.
4.3
Assembly
Usage and connec�on of all bolts, nuts & washer shall be referred to 4.5 Parts drawings.
4.3.1
Move the posts into posi�on.
Move the 4 posts into posi�on according to the orienta�on of your
hoist
. The main post is different from other
posts since it has the base plate to mount power pack and electric box.
Post #1 is the main post, which has the same structure with #3, except that #1 has the base plate to mount power
pack and electric box.
The rest 2 posts are exactly same and interchangeable.
4
Installation
1 set of non-adjustable spanners
1 set of adjustable spanners
1 set of Allen wrench.
1 set of screwdrivers (both slo�ed and phillips types)
Leveling instrument for 1M and 3M.
1 unit of forkli� with 3T capacity.
1 piece of percussion drilling (12x200 aiguille)
1 piece of electric portable drill
Insulated rubber tape
Sealing tape
Some power line
1 piece of hammer
Some duster cloth
1 piece of grease gun
1 piece of tapeline for 5M
Chalk lines
Two pieces of wood
!
!
For orders and cases with special dimensions, please consult our local partners or
Advance AutoQuip 2000
sales team to get the valid drawing to your order.
3.4.3
Lines shall be parallel or at 90 degrees’ angles.
3.4.4
Diagonal distances are of high importance. Please double check the diagonals to the same.
07
AL
2525 &
AL
2625
USER MANUAL