!
Chapter 8 Operation and use
ATTENTION: Read the instructions in chapter “GENERAL SAFETY RULES” with the utmost
attention.
ATTENTION: Before operating on the control board, make sure that there are no
bystanders and around the lift.
8.1 Control board
1. Main body of control board
2. Power lamp
3. Rotated switch
4. UP button
5. DOWN button
The operations controlled by control board are described below.
1.
Turn on the power source: Rotate the power switch(2) to ON, the power light shine.
2.
UP: Push the “UP” button until the lift reaches the desired height.
3.
DOWN: Release the lock, then Push DOWN button, lift go up around 40mm properly, the solenoid
start to work and upspring the lock block, the oil pump stop fuel feeding. The lift go down until it
reaches desired height, stop pushing the DOWN button, the lift locked.
4.
If need to UP and DOWN, repeat above step 2 or step 4.
5.
Work finished, repeat step 4, down to the ground and shut off the power switch.
ATTENTION: This operation shall be always performed before
entering the working area when the machine is lifted up.
The lift is equipped with two wire cables to prevent a possible misalignment between the
carriages. This can happen, e.g, when the lift descends on an object left in its area.
ATTENTION: This operation must always be performed before entering
the work area.
23
Summary of Contents for AutoLift AL-900DD
Page 9: ...4 2 Parts list 9 ...
Page 10: ...10 ...
Page 11: ...4 3 Hydraulic unit 11 ...