17
3.5The diagram after the platform is connected to the beam is shown below
::
NO.
ITEM
SPEC
QTY
1
Main beam
1
2
Auxiliary beam
1
3
Main platform
1
4
Auxiliary platform
1
5
Outer hexagon bolt
M16*45
8
6
Spring pad
φ16
16
7
Flat pad
φ16
16
8
Socket head cap screws
M16*45
8
Note that after the platform and the beam are connected by bolts, do not tighten them
in advance. Tighten the bolts after connecting and adjusting with the post part later.
3.5 Packing disassembly and installation of the post:
Remove the top cover of the column, take out the mechanical lock bar, place the
four columns to the corresponding positions of the beam, and insert the mechanical
lock bar between the mechanical lock and the safety lock of the beam, as shown in the
figure below.
:
Summary of Contents for SXJS4019A
Page 9: ...8 Top view of steel rope general arrangement ...
Page 43: ...10 2 2 Warning mark ...
Page 55: ...22 ...
Page 56: ...23 Chapter 7 Hydraulic System 7 1 Hydraulic pressure principle drawing ...
Page 60: ...29 ...
Page 61: ...30 ...
Page 62: ...31 ...
Page 63: ...32 ...
Page 64: ...33 ...
Page 65: ...34 ...