1
Contents:
Ⅰ Statement……………………………………………………2
Ⅱ Installation requires...........................................................2-3
2.1 Installation Tools………………………………………2-3
2.2 Installation Site………………………………………..3
2.3 Installation foundation conditions………………………3
III Installation instructions...................................3-23
3.1 Foundation Drawings……………………………3-4
3.2 Platform and steel rope installation…………………………….5-9
3.3 Post and beam installation………………………………………9-12
3.4 Installation of auxiliary platform……………………………13-16
3.5 Packing disassembly and installation of the post…………17-20
3.6 Connection of steel rope and column………………………20-23
3.7 Vertical adjustment of column required……………………23
Ⅳ Electric and pneumatic parts installation...................................23-30
Ⅴ Rolling Jack installation ....................................................30-33
Ⅵ Adjustment ....................................................................33-34
INSTALLATION INSTRUCTIONS
Summary of Contents for SXJS4019A
Page 9: ...8 Top view of steel rope general arrangement ...
Page 43: ...10 2 2 Warning mark ...
Page 55: ...22 ...
Page 56: ...23 Chapter 7 Hydraulic System 7 1 Hydraulic pressure principle drawing ...
Page 60: ...29 ...
Page 61: ...30 ...
Page 62: ...31 ...
Page 63: ...32 ...
Page 64: ...33 ...
Page 65: ...34 ...