17
d) Align the hole of post soleplate with the hole on the floor, insert the expansion bolt and
assembly the nut and washer onto the bolt, leaving screw thread of 3~5mm. Then use a
hammer to strike the spindle of the expansion bolt until the washer and the soleplate of the
post are in close contact.
e) If the upright post is not vertical, it needs to insert the adjusting washer under the post
soleplate, and then tighten the nut.
f) The tightening torque of the nut is about 80N.M.
G
.
Adjust the levelness of the primary and secondary lifting platforms:
Raise the primary and secondary lifting platforms to proper height, then operate the pressure
relief valve handle of the hydraulic pumping station to drop the lifting platform and make the
four locking pieces locate in the square holes of the up and down bar. Use a level gauge to
detect the levelness of the platform. If necessary, adjust the nut at the top of the up and down
bar, control the levelness error of the primary and secondary platforms within 5mm and then
tighten it.
H
.
Install all the close boards and covers of the lifting beam.
I
.
Install baffle plate for loading vehicle and large ramp.
J
.
Through twice on and off commissioning with no load, check whether each part works normally.
Check the locking reliability of the platform for several times. If inspection with no load is
qualified, then take vehicle-loaded commissioning to check whether hydraulic system works
normally.
K
.
After commissioning, coat moderate lubrication grease on the steel rope and pulley and
make final adjustment.
Summary of Contents for SXJS4019A
Page 9: ...8 Top view of steel rope general arrangement ...
Page 43: ...10 2 2 Warning mark ...
Page 55: ...22 ...
Page 56: ...23 Chapter 7 Hydraulic System 7 1 Hydraulic pressure principle drawing ...
Page 60: ...29 ...
Page 61: ...30 ...
Page 62: ...31 ...
Page 63: ...32 ...
Page 64: ...33 ...
Page 65: ...34 ...