background image

Arley Wood & Multifuel Stoves

5

INTRODUCTION

SAFETY

A fireguard conforming to BS 8423: 2002 should
be used in the presence of children and old/or
infirm people. If the appliance is used with the fire
door open, a spark guard conforming to BS 3248
should be fitted.

Do not use aerosol sprays or any other flame
near the appliance under fire.
Do not fit an extractor fan in the same room as
the appliance.
Fire cement is caustic, hand and eye protection
should always be worn, prolonged contact with
the skin should be avoided.
Arada Ltd will not be responsible for any conse-
quential or incidental loss or injury      however
caused.

Before continuing any further with the installation
of this appliance please read the following guide to
manual handling.

•  Always obtain assistance when lifting the

appliance.

• When lifting always keep your back 

straight. Bend your legs not your back.

• Avoid twisting at the waist. It is better to

reposition your feet.

• Avoid upper body/top heavy bending. Do not     

lean forwards or sideways when
handling the fire.

• Always grip with the palms of your hands.

Do not use fingertips for support.

• Always keep the stove as close to the body as

possible. This will minimise the cantilever
action.

• Use gloves to provide additional grip.  

THE PRINCIPLE OF THE FIRE

Your Aarrow Fire is built to the highest standard of
craftsmanship using the best materials and the most
modern equipment available. It is a highly efficient
and sophisticated piece of machinery and when
properly installed and operated it should provide a
lifetime of heating satisfaction.

Safety

is the most important consideration when

installing your fire. If not properly installed and
operated a house fire may result. installation must
comply with the Building Regulations and conform
to all relevant fire safety standards.

Arada Ltd produce a variety of appliances   ranging
from units, which are traditional in style to stoves
which are modern in appearance, all        bristling
with "High Tech" features.

Model types include simple room heaters,
convectors, integral boiler models and inset units.
Your Aarrow Fire is constructed from either single
or twin wall steel strengthened where necessary.
Cast iron is used where appropriate for decorative
features.

All fire doors are fitted with special high
temperature ceramic glass panels through which
the fire can be viewed.

Multifuel stoves are fitted with a cast iron grate to
give full multifuel facility and positive de-ashing. 

All models except integral boiler models are lined
with firebricks or heat reflective panels which
ensure complete combustion and provide a good
heat store to even out fluctuations in burning.

An internal throat plate produces turbulence to
encourage secondary combustion and directs the
flue gas around the whole upper firebox before
allowing it to escape up the chimney.

On multifuel appliances the primary air for burning
enters the ash pit chamber beneath the grate,
controlled by the air inlet mechanism.  

Aarrow Fires are also fitted with an "air wash" so
called because it provides a curtain of high speed
preheated air behind the glass to help keep it clean
and to provide secondary air/over draught.

The provision of two inlets on all multifuel stoves
gives a wide range of primary air/secondary air,
under draught/over draught combinations. 
The optimum settings will only be established by
experience in firing the appliance, and will depend
on type of fuel, the   position of the appliance in the
house, condition of chimney etc.

Summary of Contents for Arley

Page 1: ...Arley Wood Multifuel Stoves Operating Installation Manual PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE Arley 5 Flat Multifuel Stove Rev 1 June 2004...

Page 2: ...we are so confident in the reliability of our product that we offer a 3 year Warranty Should you have any questions about our Arley Stoves that are not covered in this manual please contact the Aarro...

Page 3: ...Firing 13 Ash Removal 13 SERVICING Cleaning Annual Maintenance 13 14 Accessories 15 INSTALLATION Page General Precautions 16 Handling 16 Hearth 16 Combustible Materials 16 Firebox Liner Panels 17 Thro...

Page 4: ...E BURNED IN THIS APPLIANCE TO USE THESE FUELS WILL INVALIDATE THE APPLIANCE GUARANTEE IF IN DOUBT CONTACT THE SOLID FUEL ASSOCIATION TELEPHONE NUMBER 0800 600 000 www solidfuel co uk THE USE OF SPARE...

Page 5: ...erly installed and operated a house fire may result installation must comply with the Building Regulations and conform to all relevant fire safety standards Arada Ltd produce a variety of appliances r...

Page 6: ...Hotplate 7 Operating tool 1 8 Rear liner 1 9 Side liners 2 10 Feet and fixings 4 N A Arley 7 Wood 2 1 1 5 1 2 2 4 Arley 7 Multifuel N A Arley 5 Wood 1 4 1 1 2 4 7 2 1 1 5 1 2 2 4 Arley 11 Wood N A 2...

Page 7: ...to Centre of Flue mm 105 Flue Diameter 102 4 Weight Packed Kg 50 1 7 Arley 7 Flat 8 4 8 2 2 510 486 365 399 121 127 5 56 Wood 59 MF Arley 7 Low 1 5 Arley 5 Wood 0 3 2 497 405 358 400 105 102 4 47 1 7...

Page 8: ...rovides over draught and The primary air inlet providing under draught to the base of the fire chamber through the controls on the doors of the fires PRIMARY AIR FOR ARLEY STOVES On the Arley primary...

Page 9: ...e hinges so that the below operations can be carried out on a workbench or similar level surface Fig 5 Fig 5 Removal of the Arley 5 door Unscrew the two nuts on the inside of the door securing the ret...

Page 10: ...bove steps Fig 9 Adjusting the Arley hinges FUEL RETAINER BARS Fuel retainer bars are supplied with the fire Slide and lift the bar until it is clear of the guides at each side and remove through the...

Page 11: ...reheat Blazebrite Taybrite Sunbrite Doubles Singles Anthracite Large Nuts and Welsh Dry Steam Coal Large Small Nuts Approval does not cover the use of other fuels either alone or mixed with the suitab...

Page 12: ...is well ventilated during this time EXTENDED BURNING The appliance will burn for an extended period provided Sufficient fuel is placed in the firebox The controls are set correctly Excess draught is...

Page 13: ...nd remove from the ash chamber WARNING The ash can be very hot Empty only to a metal container Even if the ash appears cold red hot pieces of ash may be concealed and could easily start a fire or caus...

Page 14: ...d shut down period DOOR GLASS The door glass should remain clear during normal daytimeburning Howeverundercertainconditions such as burning at a low rate with damp wood or overnight burning the glass...

Page 15: ...l in your Arley wood stove See Fig 10b ADD IN BOILERS See page 24 for further instructions on add in boilers PAINT Matching aerosol paint to tone in any connecting flues pipes or surrounding metalwork...

Page 16: ...HEARTH The fire should be installed to stand on a constructional hearth of non combustible materials not less than 125mm 5 thick conforming to Building Regulations Dimensions of the hearth should pro...

Page 17: ...side liners The long centre tab on the back edge rests on the rear liners The shorter turn down tabs against the vertical face Replace the front fuel retainer bars or multifuel grate Note Neither the...

Page 18: ...ng end marked L onto the low section of the comb The upper bar is fitted in a similar manner but with the end marked L inserted in the rear channel and the end marked H seated on the high section of t...

Page 19: ...tallation and are interchangeable These are fitted as follows To fit the interchangeable canopy Fig 10c Remove the front clamps Tilt the canopy as shown in stage 1 Engage the rear clips and pull fully...

Page 20: ...umes from the stove outlet to the outside air To ensure a good updraught it is important that the flue gases are kept warm and that the flue size suits the stove The termination of the outlet at the t...

Page 21: ...ocument J of the Building Regulations for England and Wales is available from The Stationery Bookshops and can also be viewed at the ODPM website at www safety odpm gov uk bregs brads htm Details on t...

Page 22: ...22 Arley Wood Multifuel Stoves INSTALLATION...

Page 23: ...ATED FLUES TYPICAL METAL INSULATED CHIMNEY SYSTEM TO BE INSTALLED TO THE CHIMNEY MANUFACTURERS INSTRUCTIONS IN COMPLIANCE WITH BUILDING REGULATIONS AND BS7566 PTS 1 4 A is minimum clearance for non in...

Page 24: ...and calculations for individual heating systems should be carried out by a qualified heating engineer In many cases your supplier will be able to offer advice and assistance Direct Systems Stainless s...

Page 25: ...e from the expansion tank should be 28mm diameter copper Pipes in unheated spaces must be lagged FINAL CHECK Before handing over the installation to the customer it is strongly recommended that the ap...

Page 26: ...appliances only c If clay or concrete flue liners used confirm that they are correctly jointed with socket end uppermost and state jointing materials used d If an existing chimney has been refurbished...

Page 27: ...S009A AFS009A AFS010 2 Throat Plate 3 Grate Bar Set 4 Hot Plate 5 Operating Tool 6 Ashpan 7 Flue Spigot Part Description Visual Aid not to scale Arley 5 Wood Arley 5 Multifuel Arley 7 Wood AFS1012 AFS...

Page 28: ...it Complete with Gasket 12 Glass Clips 13 Hinge kit Comprises 2 Hinges 4 Fixings Per Set 14 Airwash Curved Part Description Visual Aid not to scale Arley 5 Wood Arley 5 Multifuel Arley 7 Wood AFS1156...

Page 29: ...Assembly Complete with Handle Glass Gaskets Clips and Seal 19 Fire Door Locking Assembly 21 Aarrow Fires Gauntlet Gloves 22 Wood Burning Tray 23 Multifuel Upgrade Kit Part Description Visual Aid not...

Page 30: ...eer The Manufacturers decision shall be final If your appliance proves to be defective as a result of faulty materials or workmanship during guarantee we will repair or replace it FREE OF CHARGE as lo...

Page 31: ...is manual please contact your Aarrow retailer Please keep all repair receipts safely Please ensure you have this manual available when an engineer visits as they will complete the service record chart...

Page 32: ...l No I ve checked it and it s O K Assembled by Checked by Date of Purchase Name and address of supplier Please ensure installer completes INSTALLATION CHECK LIST details on page 26 of this manual If a...

Reviews: