Hardware Installation
Figure 26
Mounting the Earth Bar
1.
Slide the four bar nuts (A) into the slot at the top and bottom of each
cabinet, Page 41 .
2.
Install the two earthing bars (B) with screws (C) using a wrench, Page 41 .
3.
Install the earth bars between each cabinet at the top and bottom.
4.
Verify that the torque of all mounting screws is set to 10 Nm
+
/- 0.5 Nm.
4.4
Installing Supporting Captive Nuts
Supporting captive nuts are used to secure hardware units to the metal rack
inside the cabinet. Insert the captive nuts in the square cabinet holes, Page 42 .
41
6/1531-ASP 113 01 Uen J2 2008-07-17
Summary of Contents for MX-ONE
Page 1: ...Installing MX ONE INSTALLATION INSTRUCTIONS...
Page 6: ...Installing MX ONE 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 10: ...Installing MX ONE Figure 1 MX ONE Cabinets 4 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 26: ...Installing MX ONE 20 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 72: ...Installing MX ONE Figure 49 Installing Slides 66 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 107: ...Cabling Figure 79 Cable Connections Configure Example 101 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 111: ...Cabling Figure 81 ESU Front Connectors and LEDs 105 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 122: ...Installing MX ONE 116 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 134: ...Installing MX ONE 128 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 146: ...Installing MX ONE 140 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 148: ...Installing MX ONE 142 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 156: ...Installing MX ONE 150 6 1531 ASP 113 01 Uen J2 2008 07 17...