Step 1: Adjust the length of the Boom
Depending on the demand, adjust the reach of the forklift boom
as follows:
- Release the snap pin and pin as 1 & 2
- Pull the slide boom out to the desired length (
)
Figure 1.1
aiming the holes of the main base to match that of the slide
boom.
- Insert the Pin to the holes and lock them by the snap pin to
engage the slide boom.
- Confirm the pin surely locks the boom in position.
6
Figure 1.1
3
Snap pin
1
Pin
2
Slide
boom
Main base
Hole
2. Device usage:
Summary of Contents for AFJ25-B
Page 2: ...APPLICABLE MODEL of this F BOOM ORKLIFT AFJ25 B OPERATION MANUAL ...
Page 6: ...3 SPAREPARTLIST 3 ...
Page 16: ......