(1) Vacuum pressure gauge
(2) Control valve (tilt speed
control). Release the stopper
nut to adjust speed controller.
(3) Tilt Control lever “ 0°-90°”
(4) Positioning handle extension
“Lock-Unlock”
(6) Vaccum-Release valve
(7) Turn-knob “ Open-Close”
(Open: Vacuum generator operative)
20
Figure 1.4
(5) Lifter positioning handle
Lifter positioning
handle
5
6
Stopper pin
1
2
3
4
7
Summary of Contents for SVL100
Page 2: ......
Page 3: ...APPLICABLE MODEL of this STONE VACUUM LIFTER SVL100 OPERATION MANUAL ...
Page 6: ...1 ...
Page 7: ...Trolley stand Suction cup Vacuum tank Pneumatic cylinders Frame Control panel 2 ...
Page 9: ...4 2 Spare part list Overall ...
Page 12: ...3 Spare part list Trolley stand 7 ...
Page 14: ...4 Spare part list Suction cup left 9 ...
Page 16: ...5 Spare part list Suction cup right 11 ...
Page 24: ...19 Figure 1 3 4 CONTROL SYSTEM OVERVIEW ...
Page 31: ...26 Step 7 Place the stone slab at the desired postion figure 7 1 Figure 7 1 ...
Page 32: ...Figure 8 1 Figure 8 2 Figure 8 3 27 Stopper pin ...
Page 41: ......
Page 42: ......
Page 43: ...All Right Reserved J19 ...
Page 44: ......