Abacus Pisces 069/Info.P 04/14v1a
4
0808 256 4249
Pre Installation Requirements
Access
When deciding on the positioning of the bath there are a number of points that should be taken into
consideration:
1.
Hoist/wheelchair access.
2.
Service/cleaning access.
3.
Positions of any existing under floor pipe work or cabling.
4.
Conflict between doorways.
5.
Distance from walls/other objects.
6.
Under-floor obstructions (Water/Heating pipes, waste pipes, , under-floor heating etc)
IMPORTANT
– The bath must be sited
at least 25mm away
from any wall to ensure there are no finger trap
areas. It is usual to give around 100mm clearance to allow for easier servicing if possible.
FLOORING
Prepare the floor area and ensure it is flat, level and structurally sound & there are
NO SERVICES BURIED
within the floor fixing area. For clarity there should be no services within the space detailed on “Location of
Bath End Feet Assembly” diagram.
Where there are services or it is impossible to drill into the floor then the office must be advised so
consideration can be given to a Chemical bonding installation. This may carry a surcharge.