Note
Action
Screw: M5x16 12.9 Steel Black
Oxide (6 pcs)
Refit the swing support.
Tip
If the swing support is hard to closely fit to the
lower arm, use a plastic hammer to knock on the
swing support lightly.
2
Tightening torque: 6 Nm
xx1800003079
Guiding the upper cable package down to the swing
Note
Action
xx1800003091
Guide the upper cable package to go through the
lower arm and down to the swing.
When inserting the cable package, leave the axis-
3 motor connectors in the lower arm.
Tip
Wrap the connectors with the masking tape.
1
Refitting the axis-3 motor
Note
Action
Check that:
•
all assembly surfaces are clean and without
damages
•
the motor is clean and undamaged.
1
Continues on next page
Product manual - IRB 1100
297
3HAC064992-001 Revision: C
© Copyright 20192020 ABB. All rights reserved.
5 Repair
5.5.1 Replacing the lower arm
Continued
Summary of Contents for IRB 1100
Page 1: ...ROBOTICS Product manual IRB 1100 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 588: ...This page is intentionally left blank ...
Page 610: ...This page is intentionally left blank ...
Page 614: ......
Page 615: ......