Refitting the base
Use this procedure to refit the base.
Note
Action
Wipe clean the mating surfaces on the base
and gearbox with isopropanol.
1
Tightening torque: 4 Nm.
Fit the base cable protection in the base with
its attachment screws.
2
M6x8 (3 pcs)
CAUTION
The robot base weighs 42 kg.
All lifting accessories used must be sized
accordingly!
3
Secure the weight of the base with round-
slings and lift it to the mounting site.
4
Lift up the base into a vertical position.
5
xx1100000536
•
A: O-ring, 6 pcs (15.5x1.5)
•
B: O-ring, 1 pc (131x2)
Apply grease on the big o-ring (131x2) and
fit it in position to its groove in the base.
Replace if damaged!
6
Continues on next page
Product manual - IRB 1520
211
3HAC043435-001 Revision: L
© Copyright 2012-2020 ABB. All rights reserved.
4 Repair
4.5.1 Replacing the base
Continued
Summary of Contents for IRB 1520
Page 1: ...ROBOTICS Product manual IRB 1520 ...
Page 8: ...This page is intentionally left blank ...
Page 16: ...This page is intentionally left blank ...
Page 74: ...This page is intentionally left blank ...
Page 132: ...This page is intentionally left blank ...
Page 288: ...This page is intentionally left blank ...
Page 300: ...This page is intentionally left blank ...
Page 302: ...This page is intentionally left blank ...
Page 308: ......
Page 309: ......