3.3.13 Inspecting the leak flow (overpressure unit) in the system
General
There is a constant overpressure and leak flow in the Foundry Prime system, to
avoid dirt or chemicals inside the robot. It is necessary to check the overpressure
every 12 month to ensure correct function.
Inspection points
The following points on the robot must be inspected.
xx1700001382
Motor cover axis 1
A
Battery cover
B
Motor cover axis 2
C
Motor cover axis 3
D
Motor cover axis 4
E
Motor cover axis 6
F
Connection to balancing device
G
Continues on next page
128
Product manual - IRB 6790
3HAC063331-001 Revision: B
© Copyright 2019 - 2020 ABB. All rights reserved.
3 Maintenance
3.3.13 Inspecting the leak flow (overpressure unit) in the system
Summary of Contents for IRB 6790
Page 1: ...ROBOTICS Product manual IRB 6790 ...
Page 8: ...This page is intentionally left blank ...
Page 16: ...This page is intentionally left blank ...
Page 38: ...This page is intentionally left blank ...
Page 164: ...This page is intentionally left blank ...
Page 612: ...This page is intentionally left blank ...
Page 638: ...This page is intentionally left blank ...
Page 644: ...This page is intentionally left blank ...
Page 658: ...This page is intentionally left blank ...
Page 660: ...This page is intentionally left blank ...
Page 667: ......