Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
37
Procedure
1.
Loosen the M8 bolts (24).
G004684
2.
Remove the M10 bolts (6), and then remove the
outer terminal (5).
G004691
3.
Install the lifting tool (1), refer to
Installation of lifting tools,
page
1.
Place the lifting tool around the porcelain.
2.
Close the lifting tool.
3.
Install the bolts.
4.
Install the lifting tool (1), the M10 bolts (6) and the
washers (7).
•
Align the side of the lifting tool with the
oil-level guage (26).
G006956
Torque
40 ±4 Nm