38
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
5.
Put the pull-through cord (12) through the
box-spanner (13).
G004680
6.
Apply Molykote Multilube to the thread on the
pull-through cord (12), and then connect it to the
draw rod.
NOTE!
Or use a lubricant with equal properties
to Molykote Multilube.
G006960
7.
Remove the M16 nut (10), and washer.
G006961
8.
With a soft cloth, carefully clean the bottom end of the bushing, and the inside of the center hole. Look
for damage.
Summary of Contents for 1ZSC902110-AAA
Page 12: ...12 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 18: ...18 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 78: ...78 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 82: ...82 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...