44
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
2.
Install the winding cables to the fixed bottom
contact.
CAUTION!
Make sure that there is no tension in
the winding cables. Tension in the
winding cables will cause damage to
the cables.
G007610
3.
Install the washers and nuts. Tighten the nuts in a
crosswise sequence.
G006964
Torque
Please refer to the transformer
documentation.
4.
Remove the bolts (6), the washers (7) and the
lifting tool (1).
G006956
End of instruction
Summary of Contents for 1ZSC902110-AAA
Page 12: ...12 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 18: ...18 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 78: ...78 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 82: ...82 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...