48
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
11.
When installing the bushing at site:
1.
Measure the values (X1) and (c).
2.
Record the values in
Measurement record,
page
, for future reference.
Keep the document with the substation
documentation.
G006758
End of instruction
Summary of Contents for 1ZSC902110-AAA
Page 12: ...12 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 18: ...18 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 78: ...78 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 82: ...82 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...