44
“Operation and installation manual”
EN
6. Installation
In this section are illustrated all the installation procedure.
Chapter recipients:
• Owner
• Qualified installer
6.1 Installation of the EVSE - Terra 60
6.1.1 Floor space requirements - Terra 60
X1
Y2
Y1
X2
FRONT SIDE
A
Parameter Description
Specification [mm]
A
EVSE
N/A
X1
Space to open the left side door
600
X2
Space to open the right side panel
600
Y1
Space to open the rear door
1000
Y2
Space to open the front door
1000
NOTE
These dimensions only refer to the required space to open the doors/panels of the EVSE. A
minimum of 1 m extra on each side is required to allow commissioning and maintenance
operations on the EVSE.