Instruction for installation
and commissioning

PED/262_4D_9

Field

IT

2600T Series Pressure Transmitters

Models 264B/D/V/P

Summary of Contents for 2600T Series

Page 1: ...1 Instruction for installation and commissioning PED 262_4D_9 FieldIT 2600T Series Pressure Transmitters Models 264B D V P...

Page 2: ...vice and support worldwide We are committed to teamwork high quality manufacturing advanced technology and unrivalled service and support The quality accuracy and performance of the Company s products...

Page 3: ...pressureorAbsolutepressure Themeasurementistransmitted to a control system by means of a 4 20 mA signal with a superimposed digital signal Hart or by means of a digital transmission protocols PROFIBUS...

Page 4: ...DIAPHRAGM MATERIAL FILL FLUID check that all the parameters listed on this label or on the certificates enclosed with the transmitter are in accordance with the requirements of the area where the tran...

Page 5: ...ng Meet ANSI ISA S 82 03 hydrostatic test requirements and SAMA PMC 27 1 Other 264Dx models using direct mount and or remote seal s are compliant to SEP Sound Engineering Practice PHASE 1 PRELIMINARY...

Page 6: ...tion with impure substances It is recommended to use sterile gloves and that the removal of protectionbagsbedoneonlyimmediatelybeforetheinstallation Do not flush with impure fluids PHASE 1 PRELIMINARY...

Page 7: ...pplications 3 1 TRANSMITTER LOCATION Flow gate valves filling tees vent valve 3 valve manifold Flow measurement with clean liquids or steam condensable vapor 1 Place taps to the side of the line 2 Mou...

Page 8: ...he top or side of the line 2 Mount the transmitter above the taps Level measurement with open tanks 1 Mount the transmitter at the same height or below the lowest level to be measured 2 Connect the H...

Page 9: ...tank above the maximum level of the tank Condensate trap optional Filling tee Level measurement with closed tanks and condensable fluids wet leg 1 Mount the transmitter at the same height or below th...

Page 10: ...ion of the process tap 3 Connect the H side of the transmitter to the tank gate valve Dirty fluids Pressure or absolute pressure measurement of a liquid in a pipe 1 Place the tap at the side of the li...

Page 11: ...de of the transmitter to the pipe 4 Fill the vertical section of the connecting line to the tap with a compatible liquid through the dedicated filling tee gate valve Pressure or absolute pressure meas...

Page 12: ...ent valves so that process fluid is directed down and away from technicians when the valvesareused Thiscanbeaccomplishedbypointingthehole in the outside valve body downward and away PHASE 2 TRANSMITTE...

Page 13: ...ITTER INSTALLATION Traditional Barrel housing vertical mounting with bracket for vertical or horizontal pipe option B1 and B2 DIN housing vertical mounting with bracket for vertical or horizontal pipe...

Page 14: ...en the connections The process connections on the transmitter flange are on centers to allow direct mounting to a three valve or five valve manifold Flange adapter unions with 1 2 14 NPT connections a...

Page 15: ...ill damage the transmitter 3 Tighter the set screw Output Meters rotation In case an optional meter is installed it is also possible to rotate the meter 90 degree clockwise or 255 counterclockwise wit...

Page 16: ...ed to a lower value WARNING Electrical shock can result in death or serious injury Avoid contact with the leads and terminals High voltage that may be present on leads can cause electrical shock Follo...

Page 17: ...r rotation by turning the set nut use the 2mm Allen key supplied with the instrument IncaseofFForProfibusconnectionsseetherelevantdiagram For further information find the relevant instruction manuals...

Page 18: ...pressure A valve to admit process fluid to both sides of primary 2 Vent or drain primary as follows a Liquid service Vent all entrapped air from both sides of primary using vent drain valves then clos...

Page 19: ...rain valves on the transmitter then close them 2 Make sure to have the level in the tank at the required reference minimum level Note In case it is not possible to empty the tank it is possible to fol...

Page 20: ...t leg completely filled in 5 The output should be 4 mA dc If not a Rotate the nameplate to get access to the external push buttons Gate valve Filling tee Vent drain valve b Push the zero Z button on t...

Page 21: ...21...

Page 22: ...22...

Page 23: ...olved oxygen transmitters and sensors ammonia nitrate phosphate silica sodium chloride fluoride dissolved oxygen and hydrazine analyzers Zirconia oxygen analyzers katharometers hydrogen purity and pur...

Page 24: ...6000 Fax 1 215 674 7183 ABB S p A Via Statale 113 22016 Lenno CO Italy Tel 39 0344 58111 Fax 39 0344 56278 ABB has Sales Customer Support expertise in over 100 countries worldwide www abb com instrum...