GB
Start-up
• Replace all caps prior to putting into operation.
The function of built-in device
6953 EB-101-500
is software-
dependent. For programming, connect a PC to the Powernet
EIB bus line by means of the ETS 2 or,
Power-Project (min.
Vers. 3.0)
, by means of the EIB RS 232 interface
.
Allocation of the Physical Address
• Switch on the supply voltage.
• Press the programming button (Fig. 1, Pos. 3) on built-in
device
6953 EB-101-500
. The red programming LED (Fig. 1,
Pos. 2) illuminates.
• The red LED extinguishes after the physical address has
been programmed.
• Note the number of the physical address on device, if
appropriate, using a non-smudge pen.
Selection/Parameterization of the Application
Please refer to the current Technical Manual for a description
of the available applications/versions and appurtenant para-
meters.