Operation Manual / 4 Product description / A130-M.. - A145-M..
8 Dismantling and fitting / 8.14 Installing the cartridge group
© Copyright 2019 ABB. All rights reserved.
HZTL4031_EN
Revision H
March 2019
Product
Size
Tightening torque [Nm]
A130
M8
25
A135
M10
45
A140
M12
75
A145
M12
75
Table 39: Tightening torque (51007)
1. Coat thread of studs (51006) with high-temperature grease.
2. Align the casing position of the cartridge group to the marking.
3. Lower the cartridge group into the turbine casing.
4. Remove ring nuts and screws.
5. Fit fastening strips (51002) with Verbus Ripp® washers (51003) and hexagon
nuts (51007).
6. Tighten the hexagon nuts (51007).
Page
87
/
113