background image

Dosing Pump

AAO100

Notes

8

IM/DOSPMP

Rev. B

Notes

Summary of Contents for AAO100

Page 1: ...sing pump Measurement made easy Introduction The AAO100 dosing pump is used to introduce a cleaning solution to the jetwash of an AP200 pH system at preset intervals The timing duration and amount of cleaning is controlled by an AX400 pH analyzer AAO100 Dosing pump ...

Page 2: ...s are available for free download from www abb com analytical or by scanning this code Search for or click on AP200 Rugged pH Redox ORP sensor systems Data Sheet DS AP200 EN AP200 series Rugged pH Redox ORP sensor systems User Guide IM AP200 ...

Page 3: ... the Reservoir 2 2 2 Electrical Connections 3 2 2 1 Dosing Pump Mains Connections 3 2 2 2 Analyzer Connections 3 2 3 Dosing Pump Settings 3 2 4 Pump Tubing Connections 4 2 4 1 AP200 Connection 4 2 4 2 Connecting the Tubing to the Pump 5 3 Analyzer Settings 6 4 Cleaning Solutions 7 5 Dimensions 7 Notes 8 ...

Page 4: ...n by spraying water or a cleaning solution at them in situ thus reducing system maintenance requirements 2 Installation 2 1 Fitting the Pump to the Reservoir Referring to Fig 2 1 secure the pump to the reservoir using the two screws A provided Fig 1 1 Jetwash Schematic Fig 1 2 Location of the Jetwash Nozzles AX400 Analyzer AAO100 Dosing Pump Reservoir water or cleaning solution Level Sensor Twin W...

Page 5: ... Black and Brown wires together and connect to terminal A10 B 5 Twist the controller cable s White and Grey wires together and connect to terminal A12 C 6 Refit the analyzer s terminal cover plate see Section 6 4 1 of the analyzer s User Guide IM AX4PH 2 3 Dosing Pump Settings For optimum cleaning set the dosing pump to Refer to Section 3 page 6 for analyzer configuration instructions Caution Befo...

Page 6: ... retain for further use 2 Slide the connector B and the ferrule C onto the tubing 3 Push the tubing onto the jetwash port D and tighten the connector to a torque of 0 6 Nm Note Wash tubing is not supplied Use 6mm OD semi rigid polyethylene tube part no 0212035 Note The sealing nut must be refitted if the jetwash tubing is removed Fig 2 4 AP200 Connection A B C D ...

Page 7: ... 2 5 1 Cut the end of the tubing straight across 2 Slide union nut A and circlip B over the tubing 3 Push the end of the tubing over nozzle C 4 Ensure that O ring D is seated correctly 5 Fasten the union nut to valve E while pushing the tube onto the nozzle Fig 2 5 Connecting the Tubing to the Pump A B C D E ...

Page 8: ...ts between 15 and 45 minutes then in 1 hour increments between 1 and 24 hours Wash Duration Set the wash duration required Wash duration is set in 15 second increments between 15 and 45 seconds then in 1 minute increments between 1 and 10 minutes Recovery Period Set the recovery period required between 0 5 and 5 0 minutes in 0 5 minute increments Fig 3 1 Wash Cycle Frequency Wash Mode Cont Pulsed ...

Page 9: ...ergents or water soluble solvents such as alcohols Resins Dilute alkalis Limestone and carbonates 1M nitric acid Metal hydroxides 1M sulphuric or nitric acid Cyanides Heavy biological Proteins Mixture of 1M sulphuric or nitric acid and pepsin saturated Fibres Pressurized water with or without wetting agents Light biological Pressurized water Latex Pressurized cold water Potable water Citric acid T...

Page 10: ...Dosing Pump AAO100 Notes 8 IM DOSPMP Rev B Notes ...

Page 11: ...Sales Service ...

Page 12: ...rights in this document and in the subject matter and illustrations contained therein Any reproduction disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB ABB 2018 ABB Limited Measurement Analytics Oldends Lane Stonehouse Gloucestershire GL10 3TA UK Tel 44 0 1453 826661 Fax 44 0 1453 829671 Email instrumentation gb abb c...

Reviews: