ACH580 Installation, Operation and Maintenance Manual
23
ACH580-01 Installation
Control cable terminal and lead-through data
Imperial control cable lead-throughs, wire sizes and tightening torques (
T
) are given
below.
Metric control cable lead-throughs, wire sizes and tightening torques (
T
) are given
below.
Frame
size
Cable
lead
-
throughs
Control cable entries and terminal sizes
Holes
Max
cable
size
+24V, DCOM, DGND, EXT. 24V
terminals
DI, AI/O, AGND, RO, STO
terminals
Wire size
T
Wire size
T
pcs
in.
AWG
lb·ft
AWG
lb·ft
R1
3
0.67
24…14
0.4
26…14
0.4
R2
3
0.67
24…14
0.4
26…14
0.4
R3
3
0.67
24…14
0.4
26…14
0.4
R4
4
0.67
24…14
0.4
26…14
0.4
R5
3
0.67
24…14
0.4
26…14
0.4
R6
4
0.67
26…14
0.4
26…14
0.4
R7
4
0.67
26…14
0.4
26…14
0.4
R8
4
0.67
26…14
0.4
26…14
0.4
R9
4
0.67
26…14
0.4
26…14
0.4
Frame
size
Cable
lead
-
throughs
Control cable entries and terminal sizes
Holes
Max
cable
size
+24V, DCOM, DGND, EXT. 24V
terminals
DI, AI/O, AGND, RO, STO
terminals
Wire size
T
Wire size
T
pcs
mm
mm
2
N·m
mm
2
N·m
R1
3
17
0.2…2.5
0.5…0.6
0.14…1.5
0.5…0.6
R2
3
17
0.2…2.5
0.5…0.6
0.14…1.5
0.5…0.6
R3
3
17
0.2…2.5
0.5…0.6
0.14…1.5
0.5…0.6
R4
4
17
0.2…2.5
0.5…0.6
0.14…1.5
0.5…0.6
R5
3
17
0.2…2.5
0.5…0.6
0.14…1.5
0.5…0.6
R6
4
17
0.14…2.5
0.5…0.6
0.14…2.5
0.5…0.6
R7
4
17
0.14…2.5
0.5…0.6
0.14…2.5
0.5…0.6
R8
4
17
0.14…2.5
0.5…0.6
0.14…2.5
0.5…0.6
R9
4
17
0.14…2.5
0.5…0.6
0.14…2.5
0.5…0.6
ACH580_Inst_Op_Maint_Rev G.book Page 23