Maintenance
After the operation of the circuit is validated at start-up, the STO function shall
be maintained by periodic proof testing. In high demand mode of operation, the
maximum proof test interval is 20 years. In low demand mode of operation, the
maximum proof test interval is 10 years; see section
. It is
assumed that all dangerous failures of the STO circuit are detected by the proof
test. To perform the proof test, do the
Validation test procedure (page 230)
.
Note: See also the Recommendation of Use CNB/M/11.050 (published by the
European co-ordination of Notified Bodies) concerning dual-channel safety-related
systems with electromechanical outputs:
•
When the safety integrity requirement for the safety function is SIL 3 or PL e
(cat. 3 or 4), the proof test for the function must be performed at least every
month.
•
When the safety integrity requirement for the safety function is SIL 2 (HFT =
1) or PL d (cat. 3), the proof test for the function must be performed at least
every 12 months.
The STO function of the drive does not contain any electromechanical components.
In addition to proof testing, it is a good practice to check the operation of the
function when other maintenance procedures are carried out on the machinery.
Include the Safe torque off operation test described above in the routine
maintenance program of the machinery that the drive runs.
If any wiring or component change is needed after start-up, or the parameters are
restored, do the test given in section
Validation test procedure (page 230)
.
Use only spare parts approved by ABB.
Record all maintenance and proof test activities in the machine logbook.
■
Competence
The maintenance and proof test activities of the safety function must be carried
out by a competent person with adequate expertise and knowledge of the safety
function as well as functional safety, as required by IEC 61508-1 clause 6.
234 The Safe torque off function
Summary of Contents for ACH580-31
Page 1: ... ABB INDUSTRIAL DRIVES ACH580 31 drives Hardware manual ...
Page 2: ......
Page 4: ......
Page 16: ...16 ...
Page 30: ...30 ...
Page 39: ...Operation principle 39 ...
Page 56: ...56 ...
Page 90: ...90 ...
Page 112: ...R3 1 7 N m 112 Electrical installation IEC ...
Page 113: ...R6 1 7 N m Electrical installation IEC 113 ...
Page 114: ...R8 1 7 N m 114 Electrical installation IEC ...
Page 130: ...R3 Max 250 mA 130 Electrical installation North America NEC ...
Page 131: ...R6 Electrical installation North America NEC 131 ...
Page 150: ...150 ...
Page 152: ...152 ...
Page 166: ... Fan arrow must point up 166 Maintenance ...
Page 212: ...212 ...
Page 214: ...R3 IP21 UL Type 1 3AXD50000028643 214 Dimension drawings ...
Page 215: ...R3 Option B056 IP55 UL Type 12 3AXD50000045321 Dimension drawings 215 ...
Page 216: ...R6 IP21 UL Type 1 3AXD50000037446 216 Dimension drawings ...
Page 217: ...R6 Option B056 IP55 UL Type 12 3AXD50000045351 Dimension drawings 217 ...
Page 218: ...R8 IP21 UL Type 1 3AXD50000147052 218 Dimension drawings ...
Page 219: ...R8 Option B056 IP55 UL Type 12 3AXD50000147052 Dimension drawings 219 ...
Page 220: ...220 ...
Page 242: ...242 ...
Page 250: ...250 ...
Page 254: ...254 ...
Page 262: ...262 ...
Page 268: ...268 ...
Page 275: ...CMOD 01 multifunction extension module external 24 V AC DC and digital I O 275 ...
Page 276: ...276 ...
Page 282: ...282 CMOD 02 multifunction extension module external 24 V AC DC and isolated PTC interface ...