26 About the manual
Installing and commissioning flowchart
Task
See...
Identify the frame size of your drive: B...D.
Operation principle and hardware
description: Type designation label
(page
)
Plan the installation. Select the cables, etc.
Check the ambient conditions, ratings, required
cooling air flow, input power connection,
compatibility of the motor, motor connection, and
other technical data.
Planning the cabinet installation
(page
Planning the electrical installation
(page
)
Option manual (if optional equipment is
included)
Unpack and check the units.
Check that all necessary optional modules and
equipments are present and correct.
Only intact units may be started up.
Note
: If the converter is non-operational for more
than one year, reform the converter DC link
capacitors. For more information, contact your
ABB representative.
(page
) and
(page
)
Check the installation site.
(page
Install the drive in a cabinet.
(page
)
Route the cables.
Planning the electrical installation
(page
)
Summary of Contents for ACL30
Page 1: ...ABB high performance elevator drives User s manual ACL30 elevator drive ...
Page 4: ......
Page 20: ...20 Safety instructions ...
Page 34: ...34 Operation principle and hardware description ...
Page 42: ...42 Planning the cabinet installation ...
Page 60: ...60 Planning the electrical installation ...
Page 126: ...126 Using the control panel ...
Page 318: ...318 Maintenance ...
Page 334: ...334 The Safe torque off function ...
Page 338: ...338 Mains chokes ...
Page 342: ...342 EMC filters ...
Page 348: ...Dimension drawings 348 Frame size B D1 D2 W H1 H2 ...
Page 349: ...Dimension drawings 349 ...
Page 350: ...Dimension drawings 350 Frame size C D1 D2 H2 H1 W ...
Page 351: ...Dimension drawings 351 ...
Page 352: ...Dimension drawings 352 Frame size D ...
Page 354: ...354 Dimension drawings EMC filters JFI 0x ...
Page 356: ...356 Dimension drawings Brake resistors JBR xx ...
Page 358: ...358 Dimension drawings ...