76 Installation checklist
The supply (input power) is connected to U1/V1/W1 (UDC+/UDC- in case of a DC
supply) and the terminals are tightened to specified torque. (See
:
and
Installing power cable clamp plates
Appropriate supply (input power) fuses and disconnector are installed. (See
and
Planning the electrical installation
The motor is connected to U2/V2/W2, and the terminals are tightened to specified
torque. (See
Operation principle and hardware description
:
.)
The brake resistor (if present) is connected to R+/R-, and the terminals are tightened to
specified torque. (See
.)
The motor cable (and brake resistor cable, if present) is routed away from other cables.
(See
Planning the electrical installation
:
There are no power factor compensation capacitors in the motor cable.
The external control connections to the JCU control unit are Ok. (See
Connecting the control cables: JCU control unit
There are no tools, foreign objects or dust from drilling inside the drive.
Motor connection box and other covers are in place.
Check that...
Summary of Contents for ACL30
Page 1: ...ABB high performance elevator drives User s manual ACL30 elevator drive ...
Page 4: ......
Page 20: ...20 Safety instructions ...
Page 34: ...34 Operation principle and hardware description ...
Page 42: ...42 Planning the cabinet installation ...
Page 60: ...60 Planning the electrical installation ...
Page 126: ...126 Using the control panel ...
Page 318: ...318 Maintenance ...
Page 334: ...334 The Safe torque off function ...
Page 338: ...338 Mains chokes ...
Page 342: ...342 EMC filters ...
Page 348: ...Dimension drawings 348 Frame size B D1 D2 W H1 H2 ...
Page 349: ...Dimension drawings 349 ...
Page 350: ...Dimension drawings 350 Frame size C D1 D2 H2 H1 W ...
Page 351: ...Dimension drawings 351 ...
Page 352: ...Dimension drawings 352 Frame size D ...
Page 354: ...354 Dimension drawings EMC filters JFI 0x ...
Page 356: ...356 Dimension drawings Brake resistors JBR xx ...
Page 358: ...358 Dimension drawings ...