Chapter 4 - Changing 3/5 MVA Phase Modules
ABB
4-6 (10)
3BHS202077 ZAB E01 Rev. C
ACS 6000 Maintenance Manual
Using the Hoist
12
Attach the hoist to the cabinet at the three connection points (see
circles in
Figure 4-8).
Figure 4-8
Attaching the Hoist
13
Attach the lifting bar to the phase module using two M12 bolts.
Figure 4-9
Lifting Attachments
Fastening bolts