6. Click
Save
to save to the project.
Figure 98 Save project
Adding watch and force tables
1. In the Project tree, expand
Watch and force tables
and double-click
Add new watch table
and
provide a suitable name and click
OK
.
Figure 99 Watch and force tables
2. Open Watch table and add your required variables (for example, FB500 variables). It is possible
to copy directly from the PLC tags.
Figure 100 Watch table FB500
3. Click
to display the online values.
4. Click
to update modified values.