184 Actual signals and parameters
0128 PID 1 SETPNT Setpoint signal (reference) for the process PID1 controller.
,
settings.
-
0129 PID 2 SETPNT Setpoint signal (reference) for the PID2 controller. Unit
and
settings.
-
0130 PID 1 FBK
Feedback signal for the process PID1 controller. Unit
depends on parameter
and
settings.
-
0131 PID 2 FBK
Feedback signal for the PID2 controller. Unit depends on
parameter
and
settings.
-
0132 PID 1
DEVIATION
Deviation of the process PID1 controller, ie, the difference
between the reference value and the actual value. Unit
depends on parameter
and
settings.
-
0133 PID 2
DEVIATION
Deviation of the PID2 controller, ie, the difference between
the reference value and the actual value. Unit depends on
parameter
and
settings.
-
0134 COMM RO
WORD
Relay output Control word through fieldbus (decimal). See
parameter
1 = 1
0135 COMM VALUE
1
Data received from fieldbus
1 = 1
0136 COMM VALUE
2
Data received from fieldbus
1 = 1
0137 PROCESS
VAR 1
Process variable 1 defined by parameter group
-
0138 PROCESS
VAR 2
Process variable 2 defined by parameter group
-
0139 PROCESS
VAR 3
Process variable 3 defined by parameter group
-
0140 RUN TIME
Elapsed drive running time counter (thousands of hours).
Runs when the drive is modulating. Counter cannot be
reset.
1 = 0.01
kh
0141 MWH
COUNTER
MWH counter. The counter value is accumulated till it
reaches 65535 after which the counter rolls over and starts
again from 0. Cannot be reset.
1 = 1
MWh
0142 REVOLUTION
CNTR
Motor revolution counter (millions of revolutions). The
counter can be reset by pressing UP and DOWN keys
simultaneously when the control panel is in the Parameter
mode.
1 = 1
Mrev
0143 DRIVE ON
TIME HI
Drive control board power-on time in days. Counter cannot
be reset.
1 = 1
days
Actual signals
No.
Name/Value
Description
FbEq
Summary of Contents for ACS355 series
Page 1: ...ABB machinery drives User s manual ACS355 drives ...
Page 4: ......
Page 16: ...16 ...
Page 32: ...32 Operation principle and hardware description ...
Page 58: ...58 Electrical installation ...
Page 74: ...74 Start up control with I O and ID run ...
Page 106: ...106 Control panels ...
Page 120: ...120 Application macros ...
Page 178: ...178 Program features ...
Page 338: ...338 Fieldbus control with embedded fieldbus ...
Page 368: ...368 Fault tracing ...
Page 404: ...404 Dimension drawings ...
Page 410: ...410 Appendix Resistor braking ...
Page 434: ...434 Appendix Permanent magnet synchronous motors PMSMs ...