14 Safety instructions
•
ANSI Z535.6
American National Standard for Product Safety Information in Product Manuals,
Instructions, and Other Collateral Materials
User’s responsibilities
It is the responsibility of those in charge of the drive to ensure that each person involved in
the installation, operation or maintenance of the drive has received the appropriate training
and has thoroughly read and clearly understood the instructions in this manual and the
relevant safety instructions.
General safety information
To maintain safety and minimize hazards observe the following:
•
Before the drive is energized, make sure that:
•
all foreign objects are removed from the drive
•
all internal and external covers are securely fastened and all doors are closed,
locked and / or bolted
•
the manual release of the door safety switches is in the locked position.
•
Before starting to work on the drive, make sure that:
•
the main and auxiliary power supply to the drive is switched off, locked out, and
tagged out
•
the drive is dead
•
safety ground connections are in place
•
appropriate personal protective equipment is provided and used when required
•
everyone involved is informed.
•
When working near the running drive protective earmuffs should be worn.
•
Before work is carried out simultaneously on the drive and on other drive system
equipment, make sure that
•
the relevant safety codes and standards are observed
•
all energy sources of the equipment are turned off
•
lock-out and tag-out devices are in place
•
barriers and appropriate covers are used on equipment which is still live
•
everyone involved is informed.
•
In case of fire in the drive room:
•
Observe the established rules and regulations for fire protection
•
Only firemen with appropriate protective equipment are allowed to enter the drive
room.
Summary of Contents for ACS580MV
Page 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Page 4: ......
Page 10: ...10...
Page 50: ...50 Control system and interfaces...
Page 52: ...52 Guidelines for planning the electrical installation...
Page 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Page 90: ...90 Installation checklist...
Page 142: ...142 Maintenance...
Page 144: ......
Page 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...