Transportation, storage and disposal 57
The forks must be at least as long as the cabinet.
•
Insert the fork fully into the cabinet’s forklift pockets.
Storage
Storage conditions
The minimum requirements for storage are based on IEC 60721-3-1 'Classification of
environmental conditions: Classification of groups of environmental parameters and their
severities; Storage'.
Cabinets can be stored for up to one year in the original packaging as long as they are not
damaged or opened. For information on longer storage periods, contact the ABB service
organization.
Preparing cabinets for storage
If the drive is taken out of service for a longer time proceed as follows:
1. Cover all cable inlets and ventilation slots with an impermeable plastic or aluminum foil
and a wooden panel.
2. Add a desiccant of the appropriate quality:
•
1 unit desiccant (30 g) absorbs 6 g water vapor.
The following quantity is needed when using a polyethylene foil:
•
10 units/m
2
foil
3. Close and lock the doors of the cabinet.
4. Use polyethylene or equivalent for packaging:
•
0,3 g/m
2
/24 h water vapor diffusion
5. Attach humidity indicators to the packaging.
Check the storage conditions and the packaging regularly. Immediately repair any
damages that occur during the storage period.
Storage and handling instructions for spare parts
Electronic devices (e.g, circuit boards, power modules) are sensitive to electrostatic
discharge (ESD). ESD can damage these devices.
Apply ESD handling precautions before handling these devices.
Check the spare parts immediately after receipt for damages. Report any damage to the
shipping company and the ABB service organization.
Parameter
Limits
1K5 (climatic conditions), 1C2 (chemical gases), 1S2 (solid particles), 1M2 (vibration
and shock)
Low air temperature
-40 °C
High air temperature
70 °C
Relative humidity
5 to 85 %, no condensation
Summary of Contents for ACS580MV
Page 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Page 4: ......
Page 10: ...10...
Page 50: ...50 Control system and interfaces...
Page 52: ...52 Guidelines for planning the electrical installation...
Page 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Page 90: ...90 Installation checklist...
Page 142: ...142 Maintenance...
Page 144: ......
Page 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...