66 Electrical installation
Cable requirements
For information on the requirements for power cables and the ground cable see the
ACS580MV Engineering Guideline
For information on the requirements for the auxiliary power cable and the control cables,
see Auxiliary power and control cables guideline.
Parallel routing of power cables
Cables between drive and motor can be laid in parallel. The number of cables laid in
parallel is limited by the number of entry holes of the entry plate.
For information on the supply voltages, see Rating label of the drive.
Terminal sizes for auxiliary and control connections
Customer I/O terminal
Terminal
Wire cross-section (mm
2
)
Solid wire
Flexible wire
X1:1
0.2...2.5 mm
2
X1:3
X1:5
X1:7
X1:9
X1:11
X1:13
X1:15
X1:17
X1:19
X1:21
X1:23
X1:25
X1:27
X1:29
X1:31
X1:33
X1:35
X1:37
X1:39
X1:41
X1:43
X1:45
X1:47
X1:49
X1:51
Customer supply connection terminals
Terminal
Wire cross section (mm
2
)
Solid wire
Flexible wire
X4: N
X4: PE
0.5...4 mm
2
X5: N
X5: PE
0.5...4 mm
2
X6: N
X6: PE
1.5...35 mm
2
Summary of Contents for ACS580MV
Page 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Page 4: ......
Page 10: ...10...
Page 50: ...50 Control system and interfaces...
Page 52: ...52 Guidelines for planning the electrical installation...
Page 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Page 90: ...90 Installation checklist...
Page 142: ...142 Maintenance...
Page 144: ......
Page 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...