Electrical installation 73
Installing power and ground cables
Further information
See
ACS580MV Base frame & TEU layout design
for information on:
•
Project-specific cable entry
•
Distance between the point of cable entry and the termination bars
•
Busbar and fastening hole dimensions
•
Busbar designations
for information on:
•
Conventions for cross-references and device identification
Preparing the cable entry and the cables
Determining the cable length
1
Determine the required length of a cable between the point of entry and the connection
point inside the cabinet.
2
Cut the cable to the required length before connection.
Preparing cables for entry plates
•
Prepare the cable termination as illustrated in the figure below.
NOTICE
Risk of damage or malfunction!
Waste inside the cabinet can cause damage or malfunction.
If possible, do not cut cables inside the terminal compartment. Retrieve any waste which
accidentally dropped into the cabinet.
Summary of Contents for ACS580MV
Page 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Page 4: ......
Page 10: ...10...
Page 50: ...50 Control system and interfaces...
Page 52: ...52 Guidelines for planning the electrical installation...
Page 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Page 90: ...90 Installation checklist...
Page 142: ...142 Maintenance...
Page 144: ......
Page 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...