Planning the electrical installation
59
A diagram of the cable routing is shown below.
Control cable ducts
90 °
min 500 mm (20 in.)
Motor cable
Input power cable
Control cables
min 200 mm (8 in.)
min 300 mm (12 in.)
Motor cable
Power cable
Drive
24 V
24 V
230 V
Lead 24 V and 230 V (120 V) control
cables in separate ducts inside the
cabinet.
Not allowed unless the 24 V cable is
insulated for 230 V (120 V) or insulated
with an insulation sleeving for 230 V
(120 V).
(120 V)
230 V
(120 V)
Summary of Contents for ACS800-U7
Page 1: ...ACS800 Hardware Manual ACS800 07 Drives 45 to 560 kW ACS800 U7 Drives 50 to 600 hp ...
Page 4: ......
Page 28: ...Operation principle and hardware description 28 ...
Page 51: ...Planning the electrical installation 51 ...
Page 60: ...Planning the electrical installation 60 ...
Page 76: ...Electrical installation 76 ...
Page 84: ...Motor control and I O board RMIO 84 ...
Page 112: ...Maintenance 112 ...
Page 138: ...Dimensional drawings 138 Frame sizes R5 and R6 64778340_1 5 K ...
Page 139: ...Dimensional drawings 139 Frame sizes R7 and R8 68749930_1 7 C ...
Page 140: ...Dimensional drawings 140 IP54 and IP54R units of frame sizes R7 and R8 68749930_6 6 C ...
Page 148: ...3AFE64702165 Rev H EN 2012 09 19 Contact us www abb com drives www abb com drivespartners ...