Installation checklist
Contents of this chapter
This chapter contains a list for examining the mechanical and electrical installation of the
drive.
Checklist
Examine the mechanical and electrical installation of the drive before start-up. Go through
the checklist together with another person.
WARNING!
Obey the safety instructions. If you ignore them, injury or death, or damage
to the equipment can occur. Do the steps in section
before you start the work.
Make sure that …
Cabinet construction
The drive module is attached correctly to the cabinet.
Mechanical joints are tightened and not broken.
Parts are clean and painted surfaces not scratched.
The cabinet frame and parts which are in metal to metal contact with the frame (for example seams,
component fixing points on assembly plates, back of control unit mounting plate) are not finished with
non-conducting paint or material.
Degree of protection (IPxx)
Drive option modules and other components
Type and number of option modules and other equipment is correct. Option modules and other equipment
are not damaged.
Option modules and terminals are labeled correctly.
10
Installation checklist 115
Summary of Contents for ACS880-04FXT
Page 1: ... ABB INDUSTRIAL DRIVES ACS880 04FXT drive module packages Hardware manual ...
Page 2: ......
Page 4: ......
Page 40: ...40 ...
Page 54: ...54 ...
Page 82: ...82 ...
Page 86: ...M10 86 Electrical installation ...
Page 106: ...106 ...
Page 118: ...118 ...
Page 122: ...122 ...
Page 132: ...132 ...
Page 136: ...136 ...
Page 158: ...158 ...
Page 160: ...Standard configuration IP00 UL Type Open 160 Dimension drawings ...
Page 161: ...Drive module with optional support brackets IP00 UL Type Open Dimension drawings 161 ...
Page 163: ...Mounting plate opening 3AXD50000038119 Dimension drawings 163 ...
Page 164: ...3AXD50000038119 164 Dimension drawings ...
Page 182: ... Declaration of conformity 182 The Safe torque off function ...
Page 183: ...The Safe torque off function 183 ...
Page 184: ...184 ...