10 Introduction to the manual
Contents of the manual
•
•
Operation principle and hardware description
•
•
Guidelines for planning electrical installation
•
•
•
•
•
•
•
.
Related documents
The multidrive user documentation consists of technical drawings and a set of manuals.
The technical drawings are tailor-made for each converter. The composition of the manual
set depends on the composition of the converter, eg, which converter unit type, options
and control program has been ordered by the customer. The main manuals are listed on
the back of the front cover.
As standard, the manuals are delivered in memory sticks. For the delivery options, see
Type designation key of the converter unit
on page
Categorization by frame size and option code
Some descriptions, instructions, technical data and dimensional drawings which concern
only a certain group of units are marked with the symbol of the frame size (such as
“2×R8i”, etc.). The marking derives from the quantity and basic construction of the
converter modules that form the converter unit. For example, frame size “2×R8i” indicates
that the converter unit consists of two frame size R8i converter modules connected in
parallel.
The frame size is marked on the type designation labels. The frame size of each converter
module is also shown in the rating tables (
on page
The instructions and technical data which concern only certain optional selections are
marked with option codes (such as +E205). The options included in the drive can be
identified from the option codes visible on the type designation label. The option selections
are listed in section
Use of component designations
Some device names in the manual include the item designation in brackets, for example
[X50] to make it possible to identify the components in the circuit diagrams of the
converter.
Summary of Contents for ACS880-1607
Page 1: ...ABB industrial drives Hardware manual ACS880 1607 DC DC converter units ...
Page 4: ......
Page 12: ...12 Introduction to the manual ...
Page 34: ...34 Mechanical installation ...
Page 40: ...40 Guidelines for planning electrical installation ...
Page 52: ...52 Electrical installation ...
Page 68: ...68 Start up ...
Page 80: ...80 Maintenance 7 3 4 5 6 ...
Page 82: ...82 Maintenance 3 4 5 6 7 8 9 9 ...
Page 85: ...Maintenance 85 12 Install and tighten the two screws 10 11 12 ...
Page 92: ...92 Maintenance 3 6 4 5 4 7a 7b 7b ...
Page 93: ...Maintenance 93 9 8 8 10 11 ...
Page 96: ...96 Maintenance 4 8 6 7 5 3 ...
Page 97: ...Maintenance 97 9 ...
Page 118: ...118 Dimensions Dimension drawings Frame 1 R8i bottom cable entry ...
Page 119: ...Dimensions 119 Frame 1 R8i top cable entry ...
Page 122: ...www abb com drives www abb com drivespartners 3AXD50000023644 Rev B EN 2017 01 30 Contact us ...