Introduction to the manual 27
Quick installation, commissioning and operation
flowchart
Task
See
Plan the electrical installation and acquire the accessories needed
(cables, fuses, etc.).
Check the ratings, required cooling air flow, input power connection,
compatibility of the motor, motor connection, and other technical
data.
Guidelines for planning the
electrical installation
(page
(page
)
Check the installation site.
Unpack and check the drive (only intact units may be started up).
Make sure that all necessary optional modules and equipment are
present and correct.
Mount the drive.
(page
If the drive has been non-
operational for more than one year,
the DC link capacitors need to be
reformed (page
)
Route the cables.
(page
)
Check the insulation of the supply cable, the motor and the motor
cable.
Checking the insulation of the
assembly
(page
)
If the drive is about to be connected to an IT (ungrounded) system,
check that the drive is not equipped with EMC E202.
Checking the compatibility with IT
(ungrounded) systems
(page
)
Connect the power cables.
Connect the control cables.
(page
),
Check the installation.
(page
Start the drive up.
(page
)
Operate the drive: start, stop, speed control etc.
ACS880 quick start-up guide,
firmware manual
Summary of Contents for ACS880-17
Page 1: ...ABB industrial drives Hardware manual ACS880 37 drives ...
Page 3: ......
Page 4: ......
Page 6: ......
Page 16: ...16 ...
Page 30: ...30 Introduction to the manual ...
Page 70: ...70 Mechanical installation ...
Page 105: ...Electrical installation 105 4 5 3 6 7 ...
Page 107: ...Electrical installation 107 5 6 4 3 ...
Page 108: ...108 Electrical installation 7 8 8 ...
Page 109: ...Electrical installation 109 9 10 ...
Page 111: ...Electrical installation 111 2 360 grounding detail a b b 1 5 a 11 b a PE 10 7 5 6 8 ...
Page 117: ...Electrical installation 117 PE 11 8 4 9 11 ...
Page 134: ...134 Control units of the drive ...
Page 140: ...140 Start up ...
Page 142: ...142 Fault tracing ...
Page 154: ...154 Maintenance 4 5 6 7 8 6 10 10 ...
Page 162: ...162 Maintenance 5 6 3 4 7 ...
Page 163: ...Maintenance 163 6 8 7 11 10 9 ...
Page 167: ...Maintenance 167 3 4b 4a 4b 8 ...
Page 185: ...Technical data 185 Declaration of Conformity ...
Page 186: ...186 Technical data ...
Page 196: ...196 Dimensions Dimension drawing examples Frame 1 R8i 1 R8i ...
Page 197: ...Dimensions 197 Frame 1 R8i 1 R8i top cable entry exit H351 H353 ...
Page 198: ...198 Dimensions Frame 1 R8i 1 R8i with brake choppers and resistors D150 D151 ...
Page 199: ...Dimensions 199 Frame 1 R8i 1 R8i with sine output filter E206 ...
Page 200: ...200 Dimensions Frame 2 R8i 2 R8i eg ACS880 37 1110A 3 IP22 ...
Page 201: ...Dimensions 201 Frame 2 R8i 2 R8i eg ACS880 37 1210A 3 IP54 ...
Page 204: ...204 Dimensions Frame 2 R8i 2 R8i with main breaker F255 and top entry top exit H351 H353 1 2 ...
Page 205: ...Dimensions 205 Frame 2 R8i 2 R8i with main breaker F255 and top entry top exit H351 H353 2 2 ...
Page 206: ...206 Dimensions Frame 3 R8i 3 R8i 1 2 ...
Page 207: ...Dimensions 207 Frame 3 R8i 3 R8i 2 2 ...
Page 208: ...208 Dimensions Frame 3 R8i 3 R8i with common motor terminal cubicle H359 1 2 ...
Page 209: ...Dimensions 209 Frame 3 R8i 3 R8i with common motor terminal cubicle H359 2 2 ...
Page 217: ...Dimensions 217 Sine filter E206 cubicle 1000 mm top cable exit ...
Page 221: ...Dimensions 221 Cubicle width 400 mm top cable exit Cubicle width 600 mm bottom cable exit ...
Page 222: ...222 Dimensions Cubicle width 600 mm top cable exit ...
Page 234: ...234 The Safe torque off function ...
Page 244: ...www abb com drives www abb com drivespartners 3AXD50000020437 Rev A EN 2015 02 06 Contact us ...