3.7 Replacement of pressure relay
3.7.1 General
If the pressure relay fails to pass the insulation test and/or the function test, the pressure
relay has to be replaced.
CAUTION
It is not permissible to replace only the microswitch inside the pressure relay.
3.7.2 Tools required
■
Screwdriver
■
Open-end wrench (30 mm)
3.7.3 Spare parts required
■
Pressure relay
■
O-ring (17.1 x 1.6 mm)
3.7.4 Procedure
WARNING
Before any work is carried out on the on-load tap-changer:
Make sure that the transformer is disconnected and that earthing is properly carried
out. Obtain a signed certificate from the engineer in charge.
Be aware of the risk for slipperiness caused by oil spillage for instance when working
on the transformer cover.
Replacement of pressure relay:
1. Set the three-way valve handle to the test position (see Fig. 11 and the information plate
on the pressure relay).
WARNING
Disconnect all power sources before any work is carried out. Check that the power is
disconnected by using a Voltmeter.
2.
Disconnect the cable.
3.
Loosen the quick coupling and remove the pressure relay.
4. Install a new O-ring (17.1x1.6 mm).
5.
Lubricate the threads of the connection nut with grease.
6. Mount the new pressure relay. Tightening torque approximately 25 Nm.
7. Carry out the testing procedure according to section 3.6. ”Tests of the pressure relay”.
8.
Connect the cable. The seal between the cable gland and the pressure relay housing in-
cludes an O-ring. If the cable gland has to be changed to another type, the seal against
the housing must be secured by a gasket or by gluing. Tighten with care, max 5 Nm
torque.
9. Set the three-way valve handle back to the service position.
3. Repairs and adjustment