background image

 

QUICK START GUIDE

 

Page 8

 

© 2021 ABB. All rights reserved.

 

 

 

We reserve the right to make technical changes or modify the 
contents of this document without prior notice. With regard 
to  purchase  orders,  the  agreed  particulars  shall  prevail. 

 

ABB  does  not  accept  any  responsibility  whatsoever 

 

for  potential  errors  or  possible  lack  of  information  in  this 
document.

 

We reserve all rights in this document and in the subject matter and 
illustrations contained therein. Any reproduction, disclosure to third 
parties or utilization of its contents –

 

in whole or in parts –

 

is 

 

forbidden without prior written consent of ABB.

 

 

Copyright© 2021 ABB

 

All rights reserved

 

ABB

 

601 Shiloh Rd.

 

Plano, TX USA 

 

abbpowerconversion.com

 

Summary of Contents for CP3200

Page 1: ... test equipment will include the following Multi meter CP3200 190V Line Power System Test Procedure Perform the following steps for each cable pair Record the results in the table provided at the end of this document Testing will be performed in two manners These include testing for the presence of AC voltage on the open ended conductor pairs and testing for presence of dc voltage on cable pairs T...

Page 2: ... to proceed in using that cable pair Adjust the meter to read AC voltage and carefully connect the multimeter leads to the RING and TIP terminals for each cable pair connection If any AC voltage is measured note the level on Table 1 Adjust the meter to read AC voltage and carefully connect the multimeter leads to the RING and TIP terminals for each cable pair connection If any AC voltage is measur...

Page 3: ...proceed in using that cable pair Adjust the meter to read DC voltage and carefully connect the multimeter leads to the RING and TIP terminals for each cable pair connection If any DC voltage is measured record the data in Table 1 Adjust the meter to read DC voltage and carefully connect the multimeter leads to the TIP and GROUND terminals for each cable pair connection If any DC voltage is measure...

Page 4: ...nserted Insure that NO power has been applied to the cable pairs during this test AC Presence Pass Fail Tip to Ring Resistance Ring to Ground Resistance Tip to Ground Resistance CABLE Pair Pass Fail 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Procedure Using your multi meter set for ohms resistance measurement IF any pair reads less than 100K ohm discard that pair For each ca...

Page 5: ... If any resistance is measured 100K ohms discard that pair Adjust the meter to the ohms range and carefully connect the multimeter leads to the RING and GROUND terminals for each cable pair connection If any resistance is measured 100K ohms do not use for Line Power Full System Test Using a CP3200 to turn up the individual cable pairs sequentially add line cards After the insertion of each line ca...

Page 6: ...QUICK START GUIDE Page 6 2021 ABB All rights reserved Notes ...

Page 7: ...QUICK START GUIDE Page 7 2021 ABB All rights reserved Notes ...

Page 8: ...ccept any responsibility whatsoever for potential errors or possible lack of information in this document We reserve all rights in this document and in the subject matter and illustrations contained therein Any reproduction disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB Copyright 2021 ABB All rights reserved ABB 601...

Reviews: