Page 111
© Copyright 2021 ABB. All rights reserved.
Alarm History
Chronological view of the last 256 alarms and events that have occurred since the last time the
history log was cleared.
BD History
Chronological view of the last 16 battery on discharge (BD) events since the last time the
history log was cleared.
Boost History
Chronological view of the last 16 times the system entered boost mode since the last time the
history log was cleared.
Rectifier History
Chronological view of the last 256 rectifier alarms and events that have occurred since the last
time the history log was cleared.
Local Port History
Chronological view of the last local terminal logins that have occurred since the last time the
history log was cleared. The number of these events counts towards the total number of
Modem, Network, PIN, and Local port events which can be up to 48 events.
Modem Port History
Chronological view of the last Modem port logins that have occurred since the last time the
history log was cleared. The number of these events counts towards the total number of
Modem, Network, PIN, and Local port events which can be up to 48 events.
PIN History
Chronological view of the last Front Panel access that required password entry. The number of
these events counts towards the total number of Modem, Network, PIN, and Local port events
which can be up to 48 events.
Network Port History
Chronological view of the last Network access events that have occurred since the last time the
history log was cleared. The number of these events counts towards the total number of
Modem, Network, PIN, and Local port events which can be up to 48 events.
Configuration
This area of the menu system is where system operational parameters, system device information, and
alarm thresholds are set up. These items have been pre
-
configured for the standard QS841A controller.
Note: The controller requires time to update sectors in its flash memory when changes are made.
Please allow approximately 2 minutes for the controller to accept and place the modifications in
non
-
volatile memory before removing power to the unit.
Float Settings
Set the system float voltage and the thresholds for the following alarms:
Set Point
System Float Voltage set
-
point adjustable from
-
42.0 to
-
56.5V with a factory default of
-
54.5V.
Very High Voltage Major
Alarm occurs and the unit is shut down when the system detects voltage above its set
threshold. The threshold can be set from
-
50V to
-
60V in 1V increments. The factory default
setting is
-
57V.
High Voltage Minor
Alarm indicates an abnormally high output voltage but does not shut the unit down. The alarm
threshold can be set from
-
50V to
-
60V in 1V increments. The factory default setting is
-
56V.
BD
(Battery on Discharge) Major
Alarm occurs when the system is operating either completely or partially on battery power. The
alarm threshold can be set from
-
46V to
-
55V in 0.1V increments. The factory default setting
is
-
51.0V.
Very Low Voltage Major
Alarm indicates an imminent system shutdown due to discharging batteries or low output
voltage. The alarm threshold can be set from
-
40V to
-
51V in 0.1V increments. The factory
default setting is
-
46.0V.
Summary of Contents for CPS6000
Page 6: ...Page 6 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 36: ...Page 36 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 82: ...Page 82 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 98: ...Page 98 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 124: ...Page 124 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 146: ...Page 146 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 152: ...Page 152 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 174: ...Page 174 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 188: ...Page 188 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 192: ...Page 192 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 196: ...Page 196 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 198: ...Page 198 Copyright 2021 ABB All rights reserved This page intentionally left blank ...