Configure Additional Battery Inputs (optional)
Configure the distribution panel for the additional battery inputs as required, in groups of four.
Step
Action
1.
Remove breaker terminal posts in groups of four.
2.
Install busbars.
3.
Remove jumpers and reinstall as shown to separate the alarm contacts between the battery input and
load output sections.
4.
If optional internal battery switches are required:
Install 1, 2, or 3 pole battery switches as required to match battery discharge current. Make sure switch is
down, in the OFF position.
If optional internal battery switches are not required:
Install no
-
switch jumper busses as required.
5.
Using a voltmeter, verify polarity of the battery cables.
6.
Attach the POSITIVE cable to the RTN bus position in line with the switch.
7.
Attach the NEGATIVE cable to the busbar directly above the switch.
8.
Using a voltmeter, verify polarity of the battery connection between the RTN and battery input bus.
9.
Leave the switch in the OFF position until the unit is ready to be energized.
Figure 5
-
28: Remove Circuit Breaker Terminal Posts
Remove four circuit breaker
terminal posts
Summary of Contents for CPS6000
Page 6: ...Page 6 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 36: ...Page 36 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 82: ...Page 82 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 98: ...Page 98 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 124: ...Page 124 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 146: ...Page 146 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 152: ...Page 152 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 174: ...Page 174 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 188: ...Page 188 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 192: ...Page 192 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 196: ...Page 196 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 198: ...Page 198 Copyright 2021 ABB All rights reserved This page intentionally left blank ...