4 Maintenance
4.1 Introduction
Structure of this chapter
This chapter describes all the maintenance activities recommended for the CRB
1300.
It is based on the maintenance schedule found at the beginning of the chapter.
The schedule contains information about required maintenance activities including
intervals, and refers to procedures for the activities.
Each procedure contains all the information required to perform the activity,
including required tools and materials.
The procedures are gathered in different sections and divided according to the
maintenance activity.
Safety information
Observe all safety information before conducting any service work.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter
before performing any service
work.
The maintenance must be done by qualified personnel in accordance with the
safety requirements set forth in the applicable national and regional standards and
regulations.
Note
If the CRB 1300 is connected to power, always make sure that the CRB 1300 is
connected to protective earth and a residual current device (RCD) before starting
any maintenance work.
For more information see:
•
Product manual - OmniCore C30
•
Product manual - OmniCore C90XT
•
Robot cabling and connection points on page 98
Product manual - CRB 1300
165
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
4 Maintenance
4.1 Introduction
Summary of Contents for CRB 1300
Page 1: ...ROBOTICS Product manual CRB 1300 ...
Page 50: ...This page is intentionally left blank ...
Page 662: ...This page is intentionally left blank ...
Page 690: ...This page is intentionally left blank ...
Page 704: ...This page is intentionally left blank ...
Page 720: ...This page is intentionally left blank ...
Page 725: ......