Note
Action
Screw: M4x8 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Refit the connector plate.
4
Tightening torque: 2.6 Nm
xx2000001542
Routing the cable package in the tubular
Note
Action
Screw: M4x8 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Refit the second semicircular bracket to the tubu-
lar.
1
Tightening torque: 2.6 Nm
xx2000001749
Route the cablings.
•
Leave the CP/CS connectors and motor
connectors out from the tubular support,
and Ethernet connectors and air hoses out
from the process hub.
•
The air hoses are facing upside in the
semicircular bracket.
2
Refitting the lamp unit
Notice that the procedure is valid only when the lamp unit needs a replacement.
Note
Action
Multi-color lamp unit (16 mm):
3HAC081993-004
Refit the lamp unit.
1
xx2200001003
Continues on next page
238
Product manual - CRB 1300
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.3.1 Replacing the cable package
Continued
Summary of Contents for CRB 1300
Page 1: ...ROBOTICS Product manual CRB 1300 ...
Page 50: ...This page is intentionally left blank ...
Page 662: ...This page is intentionally left blank ...
Page 690: ...This page is intentionally left blank ...
Page 704: ...This page is intentionally left blank ...
Page 720: ...This page is intentionally left blank ...
Page 725: ......