Note
Action
Note
Draining is time-consuming.
Elapsed time varies depending on the
temperature of the oil.
Drain the gearbox oil.
7
Remove the quick coupling connector and
clean the pipe after the oil is drained.
Note
There will be some oil left in the gearbox
after draining.
8
Tightening torque: 10 Nm
Refit oil plugs.
9
Removing the complete cable package
Follow the instructions detailed in
Removing the cable package on page 215
to
remove the complete cable package.
Supporting the arm system with roundsling
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Roundsling, 1.7 m, Lifting capacity:
>70 kg
Run a roundsling around the lower arm.
2
xx2000001651
CAUTION
The arm system weighs 52 kg.
All lifting accessories used must be sized accord-
ingly!
3
Continues on next page
Product manual - CRB 1300
265
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.4.1 Replacing the base
Continued
Summary of Contents for CRB 1300
Page 1: ...ROBOTICS Product manual CRB 1300 ...
Page 50: ...This page is intentionally left blank ...
Page 662: ...This page is intentionally left blank ...
Page 690: ...This page is intentionally left blank ...
Page 704: ...This page is intentionally left blank ...
Page 720: ...This page is intentionally left blank ...
Page 725: ......