3 Installation and commissioning
3.1 Introduction to installation and commissioning
General
This chapter contains assembly instructions and information for installing the CRB
1300 at the working site.
See also the product manual for the robot controller.
The installation must be done by qualified installation personnel in accordance
with the safety requirements set forth in the applicable national and regional
standards and regulations.
Safety information
Before any installation work is commenced, all safety information must be observed.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter
before performing any installation
work.
Note
Always connect the CRB 1300 and the robot to protective earth and residual
current device (RCD) before connecting to power and starting any installation
work.
For more information see:
•
Product manual - OmniCore C30
•
Product manual - OmniCore C90XT
Product manual - CRB 1300
51
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
3 Installation and commissioning
3.1 Introduction to installation and commissioning
Summary of Contents for CRB 1300
Page 1: ...ROBOTICS Product manual CRB 1300 ...
Page 50: ...This page is intentionally left blank ...
Page 662: ...This page is intentionally left blank ...
Page 690: ...This page is intentionally left blank ...
Page 704: ...This page is intentionally left blank ...
Page 720: ...This page is intentionally left blank ...
Page 725: ......