Once the CiC adapter is fully pushed into the
switchgear cell Manually, unlock the extension     
rails and remove them from cell. (fig. 6)  

Fig. 6

Ÿ

Rack-in the CiC adapter into switchgear    
using DB rack-in/out leverage tool. 
(Legacy DB-Leverage tool) 
as shown in (fig. 7) 

Fig. 7

Ÿ

Once the cradle is fully racked in extend 
the locking bracket on LH and RH side of the   
CiC adapter as shown in (fig. 8) and lock it by  

tightening screws.

Fig. 8

1

2

Note:  If any unusual resistance is detected that 

could be abnormal interference between the CiC 

adapter and the switchgear cell parts stop 

immediately and retract the CiC adapter.  

Examine what is causing the interference and 

correct the situation.

Remove all the tools and equipment used 
for the CiC adapter installation and clean off 
any processing residues and metal scraps.

Optional Auxiliary (Secondary) Circuits Notes:

Ÿ

Prior to energizing the auxiliary circuits, verify that the secondary contacts are properly engaged by 
performing a continuity test on each installed circuit.

Ÿ

Review the “Putting into service” section of the Emax 2 installation, operation, and maintenance manual 
1SDH001000R0002 for specific checks of the installed accessories.

Ÿ

The installed auxiliary circuits have been wired in accordance with the supplied wiring diagrams which are 
based on customer furnished information.  Review the wiring diagrams for integration and compliance to the 
switchgear circuitry.

6

Summary of Contents for DB BREAKER

Page 1: ...then locked into the legacy DB switchgear thus making use of the of the Emax 2 plug in features as established in the operation and maintenance manual of the new Emax 2 circuit breaker without having...

Page 2: ...lifting must use appropriate safety equipment A 1 DB BREAKER Tools Required Drill Machine Rack out the breaker using the DB rack out leverage tool g 1 Remove the legacy OEM circuit breaker Open the d...

Page 3: ...3 onto Switchgear rails until the side levers drop down to lock the switchgear rails Lower the CiC adapter onto the rails as shown so that the rollers rest in the guide rails g 4 Fig 3 Fig 4 Push the...

Page 4: ...y lock the breaker with switchgear as shown in g 9 Remove all the tools and equipment used for the CiC adapter installation and clean o any processing residues and metal scraps Rack in the CiC adapter...

Page 5: ...stance is detected stop immediately and correct the situation before proceeding Pull out the CiC adapter from switchgear rails WARNING THE CiC ADAPTER COULD DROP DURING THIS OPERATION FASTEN IT TO A L...

Page 6: ...ge of handling and lifting must use appropriate safety equipment A 1 DB BREAKER Tools Required Rack out the breaker using the DB rack out leverage tool g 1 Remove the legacy OEM circuit breaker Open t...

Page 7: ...ABLE B ON PAGE 1 BEFORE PROCEEDING Lower the CiC adapter onto the rails from the lifting points as shown so that the rollers rest in the guide rails Fig 3 Fig 5 Place the Extended cradle rails a g 3 o...

Page 8: ...Examine what is causing the interference and correct the situation Remove all the tools and equipment used for the CiC adapter installation and clean o any processing residues and metal scraps Optiona...

Page 9: ...P DURING THIS OPERATION FASTEN IT TO A LIFTING TRUCK BEFORE PROCEEDING Pull out the CiC adapter from switchgear cell until they it is on extended rails as shown in g 12 Lift the CiC adapter from the r...

Page 10: ...www abb com Doc N 2TSA450001P1011 LK8 LKE8 LKD8 LK16 LKE16 TO EMAX 2 Senatobia MS 38668 Phone 1 662 562 0700 For more information please contact your local ABB Field Representative or Service Center...

Reviews: