27
DCB r e a k
– InstructIons for InstallatIon, servIce and maIntenance
24
9.4.5. Earth connection
The earth connection (35) must be screwed onto a
bolt (M12) to 84 Nm tightening torque. The section
of the earth connection must be at least 35 mm
2
.
9.4.6. Re-assembly of the upper shell
Place the upper shell on the lower shell in the correct
direction. Insert six screws (27) and tighten them to
48 Nm tightening torque.
—
9. DCBreak version installed in a box