110
DPA 2 50 S 4 50 - 2 50 K W
O P ER AT I N G M A N UA L
—
15.1.4-1: SNMP board
installation (1)
—
15.1.4-1
—
15.1.4-2
—
15.1.4-2: SNMP board
installation (2)
THE OPERATIONS DESCRIBED IN THIS
CHAPTER MUST BE PERFORMED BY A
SERVICE ENGINEER OF THE
MANUFACTURER OR BY AN AGENT
CERTIFIED BY THE MANUFACTURER
NOTE
THIS KIT MUST BE INSTALLED ONLY ONCE
THE UNIT IS ALREADY PLACED IN ITS
FINAL POSITION.
—
15.2-1: Elevation kit
—
15.2-1
15.1.4 Installation of the SNMP board
1. Remove the 4 plastic lids from the unit
2. Insert the SNMP card inside the slot
—
15.2
Elevation kit