Section-5
04-3006_S5_OPM_ABB_DPA_UPSCALE_RI_10-80kW_EN_150316.doc
Page 9/14 ABB
Modifications reserved
4.
Check if the LED LINE1 and battery is green. If yes, mains voltage is OK;
5.
Close internal and external battery fuses/breaker (if available);
6.
Press simultaneously both “ON/OFF” Buttons to start
-up UPS.
LCD panel must display: LED-indicator will appear as shown below:
LED Indicator
Colour
LINE 1
Green
LINE 2
Green
BYPASS
Green
INVERTER
RED
BATTERY
Green
7.
Open Maintenance Bypass (IA1) by turning it to position “OFF”. The load is now supplied by the static
bypass.
8.
Transfer load to mains and inverter for testing using submenu COMMANDS
9.
Transfer load to Inverter-
Mode by means of COMMAND “LOAD TO INVERTER”. On LCD: “LOAD
PROTECTED” will appear.
THE LOAD IS NOW PROTECTED BY DPA UPSCALE
™
RI
Summary of Contents for DPA Upscale M 10
Page 27: ......
Page 28: ......
Page 29: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 51: ......
Page 52: ......
Page 53: ......