Section-7
04-3006_S7_OPM_ABB_DPA_UPSCALE_RI_10-80kW_EN_150316.doc
Page 3/4 ABB
Modifications reserved
•
mains is present.
The battery testing can be carried out independently of the operation mode (OFF-LINE or ON-LINE) and
whether or not the load is connected. The battery test procedure can be performed from the UPS display, in the
service setup mode.
7.1.4
Battery maintenance, disposal and recycling
The battery maintenance shall be done by a certified Service Partner.
To ensure an optimum operation of the UPS system and a continuous and efficient protection of the connected
load it is recommended to check the batteries every 12 months.
Batteries contain dangerous substances that will harm the environment if thrown away. If you change the batteries
yourself, call qualified organizations for battery disposal and recycling.
Summary of Contents for DPA Upscale RI Series
Page 27: ......
Page 28: ......
Page 29: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 51: ......
Page 52: ......
Page 53: ......